Latest Projects

Single Storey Rear Extension with 2 sky pods, creating a large open plan family room and separate utility.

             The work involved a substantial extension programme involving people with plumbing, painting and decorating, carpentry, excavation of groundworks and bricklaying, electricians and design skills - plus the incorporation of substantial steels requiring great expertise and stamina. Their tidiness, courtesy, and quality of workmanship merits a score of 10 whilst timekeeping merits a score of 8.
 

Mr Medlow’s staff are highly skilled, loyal and customer-focused – and a pleasure to have working on the project. These characteristics were needed because of the weather, the difficulty of obtaining materials from suppliers and the prevailing financial and viral possible  threat.


Throughout, Mr Medlow created progress because of his energy, imagination and ideas, enterprise, stamina and 30+ years of experience.


The cost of the project was approximately that in the original contract though we commissioned significant extra work.


In summary, we would strongly recommend Mr Medlow’s firm. We are happy to have this assessment published. 

Professor David Rhind and Christine Rhind

IMG-3645 (1).jpg
Turnpike 13 - edited.jpg

A substantial extension programme to develop the property from a 2 bedroom cottage to a 5 double bedroom home.

Features include:

  • 5 double bedrooms

  • 4 piece family bathroom

  • En-suite shower to main bedroom

  • Impressive live in style kitchen

  • Dining Room

  • Lounge

  • Utility Room

  • Downstairs shower room

  • Gates to driveway

Mr and Mrs Kent

Extension close up 1.jpg

Single Storey Rear Extension, hallway reconfiguration, paved garden and garden outbuilding/office.

           Jon sat down with us and went through everything we wanted and made some suggestions which we incorporated in the final design. He came up with ideas that we would never have thought of! He then produced the final drawings for us that we used to apply for planning consent and were approved.

Jon and his team came to site and cleared it ready for the build to begin. They cleared up after themselves, were very accommodating working around the site. Lots of difficult access issues but Jon and his team worked it all out and cleared it sooner than we thought would be possible! (see project page for full Testimonial).